Enter your email address:

Delivered by FeedBurner

 

ElecComm Power Services Blog

RSS Grab ElecComm Power Services Blog Feed

Developing a Strategy to Prepare for Power Failures

Darren Kincaid - Friday, November 11, 2011

At ElecComm, we keep our eyes out for interesting and informative articles that we believe our customers will find beneficial to help their emergency contingency plans.  The article below is from Dr. Jim Kennedy at Continuity Central who does a great job detailing the thought process behind developing such a plan.

According to a recent Forrester Research survey nearly half of the declared disasters reported over a one-year period were due to power failures. To ensure that this type of event does not escalate into a disaster that results in business disruption and lost revenue for your organization you need to be prepared. And this requires a power failure response strategy as part of a wider business continuity plan.

This article explains how to develop such a power failure response strategy.

Determine what you have
The first step in preparing a power failure response strategy is to identify and understand the electrical distribution system layout and design in the facility to be protected. Most building or office electrical power distribution systems are quite complex. In order to properly understand them, wiring documentation will need to be reviewed and brought up to date. If up-to-date documentation is not available when conducting the review, it needs to be developed as soon as possible and prior to developing the power failure response strategy. An electrician or electrical engineer can aid in this effort.

An up-to-date electrical system schematic or wiring diagram will clearly identify how the main components of the electrical system are connected. It should include any special systems, such as uninterruptible power supplies or power protection devices. Specifics regarding equipment voltage and current ratings should be identified and documented. It is also important to identify each major component with a unique name describing its location and important power ratings.

In addition to identifying the equipment on the drawings, it is equally important to physically match the system or component to the drawings by affixing a permanent label to the actual equipment for identification purposes. This, along with a flashlight, facilitates finding the equipment quickly in the case of an emergency.

Determine what your organization’s mission critical requirements are for emergency power
Critical electrical power requirements, or ‘loads’ as they are often called, are usually developed as part of a business impact analysis and risk assessment. However, if these assessments have not been developed as part of an on-going business continuity or disaster recovery program, then now, before a crisis occurs, is a good time to identify the organization’s critical need for electrical power.

Once the electrical power distribution system is documented and understood, the next step is to identify business critical loads that will require emergency power in the event of a power failure. At this point it is important to note that uninterruptible power supplies and emergency generators may not normally provide for all of an organization’s electrical needs. So, decisions will need to be made to determine what equipment in the operation in time of a disaster or incident absolutely need to have power maintained during a power outage.

As I indicated earlier, this is usually done as part of an overall business impact analysis, where business critical systems and devices within the organization are identified. These are systems for which special considerations need to be made in case of any type of failure — of which power failures are only one example.

After critical systems have been identified their sources of power within the facilities need to be identified on the electrical drawings to make sure it is understood that they are critical to the operation (i.e., critical computing systems, LAN/WAN network devices, PBXs, production and/or security equipment). If the electrical distribution system has been properly designed, all business equipment should be connected to common circuits and separated from non-critical equipment. This makes it much easier to isolate mission critical circuits and to properly connect them to emergency power sources during an emergency. It is also important to keep the documentation up-to-date for the equipment contained on these circuits, so that the electrical load (current required to keep the equipment running) is properly identified and emergency power generation equipment can be properly sized.

Determine what type of emergency power your organization should use
Typically if the power failure lasts less than an hour an uninterruptible power supply (UPS) may be able to sustain power – if properly sized and maintained. However, if the power outage lasts in excess of an hour, as has been the case with several US, UK, and European blackouts in the last few years, emergency generators will be needed. If it is absolutely critical to maintain power for an entire operation throughout a blackout, regardless of the length of that blackout, then consideration to possibly installing permanent emergency generators should be made. It should be noted that this type of installation is quite expensive and complex to install, operate and maintain, and may not be viable due to local building codes or environmental constraints. If it is decided that the organization wants to install permanent electrical generation equipment, then an experienced professional’s help should be solicited.

Portable electric generators can also be used. They can be installed after the power has failed and before the UPSs would shut down. If a portable generating unit is to be used, it is absolutely critical that the electrical load of each emergency circuit (measured in amperes) be known so that the generator(s) can be correctly sized (be large enough to supply the rated current of all devices to be powered during the power failure). The wattage and voltage ratings for each generator should be defined prior to the outage and procedures documented, so that when acquiring them, the load does not have to be calculated under adverse conditions: which usually leads to error and further disaster. If it is decided that the use of portable generation is the best alternative, it is prudent to arrange a pre-emergency contract to rent or lease the generators.

If a pre-rental or lease agreement is undertaken, be sure that the contract specifies delivery time and maintenance if a provided system/component fails to operate correctly. It is also important to understand in what priority order you your generators will be delivered especially in case of a widespread emergency outage. However, even with a pre-contracted agreement in place, there is no real guarantee that the generators will be available if the power outage is widespread.

It may be in your organization’s best interest to acquire portable generators ahead of time and store them for a time when they are needed. If you choose this course, it is important to establish and implement proper maintenance procedures (e.g., running the generators periodically and changing the gas and oil as recommended by the manufacturer) to make sure that the generators function when needed.

Making the generators ready for the next outage
Before any power failure occurs is the time to plan how each generator will be connected during an emergency. Here is where an electrical engineer, electrician or experienced technician is critically important. Manual transfer switches can be placed near the emergency panels ahead of time so that switching to emergency power, once the generators are connected and started, is made easier.

All of the necessary connection equipment (e.g., cables and connectors, etc.) should be stored near the place where the generators will be used. In addition, fuel and operational supplies need to be planned for as generators will consume large supplies of gasoline and oil if they need to run for many hours. Emergency generator procedures need to be well documented beforehand and attached to the generator or the transfer switch. This ensures that the generators will be connected properly and will not damage any wiring or critical equipment.

If the connection is very complex then part of the emergency response procedures should include an on-staff or contracted electrician or experienced technician to perform the connection of the generators.

Ensure the generators are functional when needed
To ensure that the emergency generation equipment (permanent or portable) is ready in case of an emergency, regular testing is essential. Testing procedures should be established (and internal audits conducted to regularly review compliance) to ensure that the generators will work properly when called upon for service.

The generators should be tested under actual circumstances and full load, if possible, but, if not, then a simple functional test will have to suffice. This functional test should include starting and running each generator for a minimum of thirty minutes at least every month or minimally, once each quarter. Also make sure that each generator’s fuel tank is full upon completion of each test and that there are documented procedures to obtain fuel during an emergency (perhaps the local gas station may not be the best source). Manufacturers of generating equipment typically recommend that fuel be replaced that is more than one year old.

Formal process and procedures are critical to success
Experiences of business continuity and disaster recovery professionals have shown that proper planning in advance of any incident makes response to that incident much more effective and electrical power failures are no exception. The group responsible for reacting during a blackout should make sure that well documented and easily understood procedures are developed and maintained.

During a crisis, people react differently than when there is no stress, so the procedures should be clearly written. One method to make the procedures easier to follow would be to use step-by-step check lists or flow-charts. Having these procedures available at each generator site to connect each portable generator will save a great deal of time during an actual crisis event. It is also important to note that the procedures should include both how to connect the generator and how to disconnect the generator when power has been restored.

Running generator installation tests periodically can help make sure everyone is comfortable and prepared for the time when the drill may be replaced by a real power outage situation.

Source:   Continuity Central (Dr. Jim Kennedy)

Hurricane Irene Headed to New York, New Jersey and New England

Joseph Coupal - Thursday, August 25, 2011
Hurricane Irene is fast approaching New England, New Jersey and New York. In the event of power failures, disaster relief agencies will be in need of emergency backup power equipment. Nothing is more damaging to hospitals and commerce than sudden power outages.

ElecComm Power can assist with commercial disaster relief. With establish relationships with NSTAR and Newington Power Company as their supplier for backup emergency power, you can feel comfortable in our services. We are also reaching out to the Red Cross, FEMA, Hospitals, Power Companies, and shelters to let them know that we can supply portable commercial generators and power equipment in areas of power loss.

Hopefully Hurricane Irene will take it easy on us in the North East. However, in the event that hospitals, power companies and businesses are met with sudden power loss, keep in mind ElecComm Power.

Submarine Cable Failure on Martha’s Vineyard

Joseph Coupal - Monday, August 22, 2011

When the Martha’s Vineyard utility company experienced an underwater cable failure to the island they called on EPS.

Both the high summer power demand and President Obama’s upcoming visit to the Vineyard contributed to the decision to use temporary power on the island.

click on images to enlarge

EPS quickly dispatched 4 MW’s of power and 2 x High voltage transformers to the island. EPS’s engineers handled all logistics for the project including teaming up with a local barge company to get all equipment and personnel over to the island.

If the utility experiences another failure or the power demand becomes excessive the generators can be remotely put on line within minutes. Repairs are expected to take 1-2 months.


Recent Posts


Tags

back-up power local construction contractor commercial generator rentals generator for rent ElecComm Serivce area temporary electric heaters rental chiller, MA, CT, RI, NH, NY Winter Outages in Boston, Hartford, Providence air conditioner rentals new england based utility company generators for rent miles of cables shipyard power supply chiller rentals, MA, CT, RI, NH, NY tower power generators temporary power supply unit standby power power for outdoor events, MA, RI, NH, CT, VT, ME, NY temporary commercial heating generators for movie production portable generator temporary electric power emergency power supply system martha's vineyard high voltage transformers utility company rental power commercial business chiller rentals transformers industrial generators renting AC rentals MA, CT, RI, NH, NY commercial cooling units elecomm power services construction job telecom MA, CT, RI, ME, NY, NH, New England floods renting heaters air conditioner units rentin generators EPSS renting a portable generator power loss NY, CT areas radiant heater power supply systems rent hurricane season rental generators MA, CT, RI, NH, NY generator rental emergency backup power diesel radiant heater temporary power source ElecComm emergency power generators tips on renting generators walk in refrigerator air conditioner unit generator commercial heater suppliers power source best generators for rent power outage best generators unexpected power outages diesel fuel tanks usese for rental generators chillers for rent, MA rent generators generator rental conditioning buy a larger generator renting chillers heat waves New Office in Connecticut rental chillers, MA, CT, RI, NH, NY emergency generator rental emergency power emergency power plans air rental heaters NStar heavy rain heater rentals MA, CT, RI, NH, NY commercial generator rental flame-free electric heaters power cables and distribution panels generator rental tips manual generators emergency electrical distribution units portable power for events air conditioner rental emissions-free electric heaters generators for concerts moistur-free electric heaters electronic load banks portable rediant heaters planned electrical shut down supplying temporary power emergency power outage electric heaters renting air conditioners rental AC new england hospital disaster plans generators power generators fuel tanks rent commercial heaters emergency power supply systems down power line buy generator rented generator air cooled chillers laod bank rentals MA, CT, RI, NH, NY emergency back up plan generators for festivals back-up power source temperature control equipment back up power telecom industry energency generators refrigerator rentals, MA, CT, RI, NH, NY generator rentals air conditionin loadbank rentals rent commercial generators temporary emergency power rent commercial air conditioners HVAC EPSS rentals martha's vineyard utility company downed powerlines connector cabels head of the charles regatta power failure emergency power contingency plan radiant heat rentals portable commercial generators emergency power supplies load bank equipment rental chillers choosing a generator temporary and emergency power solutions rental generators, MA, RI, NH, CT, VT, ME, NY power outages planned power loss March blackout Boston's Back Bay rental generators rental chillers, MA portable heater water cooled chillers renting a chiller power accessories fuel efficiency transformer rentals ma northern alabama tornado 2011 emergency situation emergency power contingency plans refrigerator storage load bank transformer rental snow emergency procedure scheduled power outages commercial chillers for rent, MA commercial generators cooling systems renting power source hurricanes rent air conditioners emergency power outages commercial generators for rent emergency power contingency plans MA, CT, RI, NH, NY winter storms commercial refrigerator, ma generator rentals MA, CT, RI, NH, NY power distribution units contingency plan power shut off emergency power solutions black-out New York flooding chiller rentals, MA commercial rental generators MA, CT, RI, NH, NY air cooled units choices on generators industrial equipments chillers electricity portable generators Power Outage Downtown Boston renting a power unit hurricane Irene rental commercial generators power equipment rentals chiller rentals MA, CT, RI, NH, NY air conditioning applications EPS ship dehumidification system Planned power outages ice storms renting generators loadbanks commercial rental generators quicker response temporary power 36 Michael Drive in Meriden, CT commercial heater rentals electric power inductive load banks massachusetts renting commercial generators commercial generator massive power outages rent a commercial generator emergency backup power unscheduled brownouts fuel tank solutions ElecComm Power Services event chiller electric power as source of energy Boston, MA emergency power equipment emergency power generation generators New York Boston Hartford electric company contingency power supplies commercial construction load banks special events electrical energy cambridge ma Temporary Commercial Heaters unexpected power loss water cooled units cambridge industrial air conditioning system Downtown Boston commercial electric heaters air conditioning temporary utilities power supplies commercial transformers emergency generator commercial generators MA, CT, RI, NH, NY power interruption emergency power supply outdoor events norther alabama disaster tornado rental commercial heaters contingency power plan power cables Emergency Generated Power movie production distribution cables emergency generators rent a a commercial generator cooling units generators for outdoor events generators as backup support rental New England and New York emergency power system temporary power and heat Braintree, MA emergency electrical generator rentals industrial grade generators industrial EPS prepared for possible heat related failures capacitive load banks power generation commercial air conditioning rental, MA, CT, RI, NH, NY renting portable generators outdoor festivals industrial cooling units rental refrigeration unit walk in refrigerator rentals, MA, CT, RI, NH, NY Back Bay Boston, MA EPS Generators emergency generator rentals rental generators refrigeration unit excellent generator refrigerator storage needs, ma natural disasters disaster business generators

Archive

 
affiliations

Copyright 2012. ElecComm Power Services. 149 Providence Street Hyde Park, MA 02136. All Rights Reserved.
Created and Maintained by WSI Pro Marketing, Inc.


ElecComm Power Services proudly services all MA, CT, RI, NH, ME, VT, and NY, including Arlington, Boston, Bridgeport, Brookline, Cambridge, Canton, Carlisle, Cohasset, Cranston, Cumberland, Dedham, Dover, East Providence, Easton, Foxboro, Framingham, Franklin, Hartford, Hopkinton, Hyannis, Lincoln, Lincoln MA, Mansfield, Marlboro, Medfield, Milton, Needham, New Haven, Newport, Newton, New York, Norwood, Providence, Seekonk, Scituate, Sharon, Sherbourne, Smithfield, Somerville, Springfield, Stamford, Stoughton, Walpole, Waltham, Warwick, Watertown, Wayland, Wellesley, Westerly, Weston, Westwood, Worcester, Wrentham, and more.