Temporary Chiller System for Air Force Testing Facility Hospital Power Outage Power Generator for Planned Shutdown
Power Outage - CT press release Transformer Replaced
Temporary Power for Outdoor Event - Volvo Ocean Race Ice Storm Power Outages Contingency Power Plan - Braintree, MA
Submarine Cable Failure

TEMPORARY POWER
DURING RECORD HEAT

New England
On July 3, 2010 - New England based utilities turned to ElecComm Power Services to provide temporary power during record heat waves. ElecComm Power Services installed 6 MW's of power for local utilities. This team of engineers and technicians installed (3) 2000kW generators and (3) 2500kVA step-up transformers. EPS handled all logistics during these projects, including transportation, low voltage cable installation, fueling, and 24/7 technical support while equipment was on line. During this time period (July 2010) EPS was also called upon to supply temporary power for over 50 separate isolated power outages for utilities.

affiliations

Copyright 2011. ElecComm Power Services. 149 Providence Street Hyde Park, MA 02136. All Rights Reserved.
Created and Maintained by WSI Pro Marketing, Inc.


ElecComm Power Services proudly services all MA, CT, RI, NH, ME, VT, and NY, including Arlington, Boston, Bridgeport, Brookline, Cambridge, Canton, Carlisle, Cohasset, Cranston, Cumberland, Dedham, Dover, East Providence, Easton, Foxboro, Framingham, Franklin, Hartford, Hopkinton, Hyannis, Lincoln, Lincoln MA, Mansfield, Marlboro, Medfield, Milton, Needham, New Haven, Newport, Newton, New York, Norwood, Providence, Seekonk, Scituate, Sharon, Sherbourne, Smithfield, Somerville, Springfield, Stamford, Stoughton, Walpole, Waltham, Warwick, Watertown, Wayland, Wellesley, Westerly, Weston, Westwood, Worcester, Wrentham, and more.